The hospital chose a modular solution to enable them to quickly meet their increasing accommodation demands. Minimal time spent onsite meant less disruption to the day-to-day running of the hospital – imperative for management, staff and patients.

Working closely with Ramsay Health, Erilyan and Team 2 Architects, the design consisted of 48 modules with a total area of 1562 sqm connecting to the existing hospital facilities via two linking corridors.

Each ward room is designed for single occupancy and includes an ensuite, modern furnishings and a bulkhead air-conditioning system that enables room temperatures to be individually adjusted to patient comfort.

The construction of the hospital was completed in 16 weeks with the modules being installed in four stages over a two week period.

Watch the time-lapse video of the project being installed below.