Logistics and Delivery

From tight urban sites to regional communities, remote locations and challenging terrain, we plan every project with its destination in mind.

Homes NSW module delivery by Modscape + Modbotics
Homes NSW module delivery by Modscape + Modbotics

Built for the journey: modular delivery from factory to site

Every module is designed with transport and installation in mind. From dimensions and access requirements to transport routes and crane positioning, logistics are considered from the earliest stages of a project.

Most modules leave the factory with services, internal finishes, joinery, kitchens and bathrooms already installed. They are transported individually by truck, with a typical two-bedroom home comprising two modules that are brought together on site.

By completing more of the building offsite, we reduce the amount of work required at its final location. This is particularly valuable in regional, remote and exposed environments, where access, labour availability and site conditions can make conventional construction more complex.

  • 1,734 Modules delivered in FY26
  • Australia & the Pacific Delivering modular buildings across diverse and challenging locations
  • 40% Fewer onsite workers compared to conventional construction

Delivering to urban, regional or remote sites

Every site brings its own logistical considerations. Constrained urban locations require careful coordination of access, transport and installation, while regional and remote projects can involve long travel distances, limited local labour and challenging terrain.

Our experience delivering modular buildings across diverse locations means these requirements are considered early, with transport, site preparation and installation planned as part of the overall project.

By completing more of the building offsite, we can minimise disruption in urban environments, reduce reliance on local trades in regional communities and limit construction time in exposed or remote locations.

 

Delivering MMC Homes Across Sydney for Homes NSW

According to our Project Manager, Burak Guler: “The most impressive thing about this job is seeing an entire home arrive on the back of a truck, and a day later, you’ve got a fully completed home.”

Behind that moment is months of planning, manufacturing and coordination. Burak shares what it took to deliver the first MMC social housing homes for Homes NSW in the Sydney metro.

Modscape + Modbotics was engaged by Homes NSW under a Design & Construct contract to deliver 20 turnkey social housing homes across metropolitan Sydney. The project comprises 72 modules manufactured in our factory while site works progress concurrently.

Each home is manufactured in 20 days, installed in 1 day, and completed over a 4-week post-install programme, putting handover just 4–6 weeks from the start of construction.

 

-