Modscape + Modbotics Approach to Design & Delivery

Advanced Manufacturing & Kit of Parts
The Modscape + Modbotics approach to project design and delivery combines advanced manufacturing with a prefabricated kit of parts methodology—redefining how buildings are conceived and constructed.
Each component is precisely fabricated using automation, robotics, digital twins, and AI to streamline every stage of delivery. This integrated process enhances quality, reduces build time, minimises waste, and improves sustainability, safety, and cost-efficiency.
Explore how our methodology leverages:
– Advanced manufacturing
– Building 4.0 CRC principles
– National Construction Code (NCC) compliance across fire, ESD, structure, and acoustics
– Automation
– Prefabricated kit of parts

Building 4.0 CRC Principles at Modscape + Modbotics
Faster
– 50% faster program compared to conventional construction
– New materials and systems, ongoing development
– Innovative new business and finance models
Compliance
– Livable Housing Australia (LHA) Gold
– Apartment Design Guidelines
– Homes Standards
– Building Practitioners Act
– NCC / BCA
Collaboration & Education
– Construction Cloud platform
– Early Contractor Involvement
– TAFE & Tertiary Training
Digital Twin Design
– BIM model coordination
– LOD 400-500 for manufacturing
– Optimised performance
– Design for Manufacture and Assembly (DfMA)
Decisions Backed by Data
– Continuous improvement
– Lessons Learnt Register
– Innovation
Waste Reduction
– 75% less waste than conventional construction
– Designed and engineered to relocate, re-purpose, re-use or recycle
Sustainability & Resilience
– 300% Carbon reduction
– Whole of Life
– Timber structure
– Higher quality
Automation
– Fully automated Modbotics robotic line manufacturing prefabricated building elements
Module Kit of Parts
– Modules completed to 95% offsite
– Improved quality control and optimised production
– Less wet weather risk
– Less crane hook time, fewer lifts, faster installation
– Greater certainty and improved scheduling
Kit of Parts & DfMA
– Safer assembly methodology & detailing
– Value-based logistics & supply chain management
– Discrete components assembled in different way

NCC Deemed to Satisfy Compliance Solutions

How We Automate

Prefabricated Kit of Parts Building Plan
1. Insitu build ground floor podium
2. Prefabricated stair & lift cores
3. Prefabricated kit of parts modules
4. Prefabricated kit of parts corridor
5. Prefabricated kit of parts façade
6. Prefabricated lift
7. Prefabricated balcony
8. Prefabricated kit of parts roof

Prefabricated Kit of Parts
1. Insitu build ground floor podium
2. Prefabricated stair & lift cores
3. Prefabricated kit of parts modules
4. Prefabricated kit of parts corridor
5. Prefabricated kit of parts façade
6. Prefabricated lift
7. Prefabricated balcony
8. Prefabricated kit of parts roof

Module Kit of Parts

Kit of Parts Module - Components
1. Ceiling Cassette
2. Electrical Collection
– Smoke Detector
– Internal Downlight
– External Downlight
– Pendant Light
– Wall Light
– GPO
– Kitchen Linear Light
3. Kitchen Joinery Unit
4. Hydraulic Collection
– Kitchen Sink & Tap
– Rangehood
– Wall Heater
– Extraction Vent & Ductwork
– HVAC Vent & Ductwork
– Split System AC
5. Door Collection
– Front Door
– Bedroom Door
– External Sliding Door
6. Window Collection
7. Window Furnishings
– Holland Blind
– Curtain
8. Structural Wall
9. Internal Wall
10. Bedroom Joinery Unit
11. Bathroom Module
12. Floor Cassettes
– Floor Cassette 1
– Floor Cassette 2
13. Floor Coverings
– External Tiles
– Timber floorboards
– Carpet
